Skip to content

Minden Water Management Plan – Implementation Plan

Categories: Water Management

Posted On: December 1, 2020

The Minden Dam Waterpower Generating Station Water Management Plan (WMP) was prepared and finalized in January 2010 to follow the goals and principles set out in the Ministry of Natural Resources and Forestry’s (MNRF) Water Management Planning Guidelines for Waterpower (MNRF, 2002). The WMP was subsequently amendment in 2018 to align with MNRF’s Maintaining Water Management Plan Technical Bulletin (MNRF, 2016) that replaced the earlier 2002 guidelines.

The following document is the initial Implementation Report for the facility since the requirement was added to the WMP in June 2018.

Minden Dam WMP Implementation Plan 2020